Guide to writing work method statements

by Riskex on May 30, 2010

in Work Method Statements



Struggling with how to write a safe work method statement? Workcover have produced this excellent guide for writing work method statements in plain English. Plain English Guide to Writing Work Method Statements (3754)

CONTENTS INCLUDE:

  • Suggested proforma
  • Proforma for work method statements
  • Points to remember when writing work method statements in plain English
  • Seven ways to write effectively
  • 1) Write out the job procedure step by step
  • 2) Use active, not passive voice
  • 3) Sequence ideas logically
  • 4) Keep sentences short and clear
  • 5) Choose words carefully
  • 6) Use verbs not nouns
  • 7) Consider layout and formatting
  • Alternatives to writing
  • References
  • Appendix 1 Formal words and long winded phrases
  • Appendix 2 Redundancies – unnecessary repetitions
  • Appendix 3 Verb forms for commonly used nouns
  • Appendix 4 Checklist – writing effective work method statements

{ 3 comments… read them below or add one }

Asesor SHA June 14, 2011 at 2:22 PM
Riskex June 13, 2011 at 5:03 PM
Riskex May 30, 2010 at 7:50 AM

New blog post: Guide to writing work method statements http://www.safetyrisk.com.au/2010/05/30/guide-to-writing-work-method-statements/

Leave a Comment

{ 2 trackbacks }

Previous post:

Next post: