Work Method Statements – more examples

by Riskex on July 12, 2010

in Free Safety Stuff,Work Method Statements



We are being inundated with requests for free examples of safe work method statements, particularly for lawn mowing? Here are some really good examples from the The Municipal Works Officers Association (MWOA) Website.

Air Jack Operation

Air Tools Operation

All Hazards

Arc Welding

Battery Charger

Below the Ground less than 1.5 metres

Bench Grinder

Bleeding Seal

Bridge Cleaning

Bridge Inspection

Cable Location

Chainsaw operation

Cleaning Gutters on a single story tiolet block

Compressor operation

Concrete Footpath Operation

Cressy Shelford Road

Driving Eauipment

Edge Repairs

Elevated platform Boom

Gantry Crane

Hand held post hole digger

Hand Lawn Mowing Operation

Hand Chemical Spraer Operation

Hedge Trimmer

Inspection of Roads

Jet Patcher Operation

Ladder Operation

Larpent Rd Widening

Linemarking

Litter Collection

Loading and Unloading Equipment

Lone Worker Operation

Major Drainage Operation

Manual Handling Operation

New Document

Oval Maintenance Grass Mowing Operation

Oxy Cutting Operation

Oxy Welding Operation

Personal Protection Equipment

Pit Works Operation

Pothole Patching

Re-sheet Roads

Rotary Hoe operation

Safe Handling of Sharps

Servicing Diesel Equipment

Sign Maintenance

Slasher Tractor Mounted

Spraying Chemicals

Stabilization Operation

Traffic Control

Traffic Roundabout Operation

Traineeship

Tree Planting and Mulching

Twin Vibrating Drum Roller Operation

Two Way Radio Operation

Visual Bridge Inspection

Weed Grass Trimmer Operation

Woodchipper Operation

Working at Height Above 2 Metres

{ 1 comment… read it below or add one }

Riskex July 12, 2010 at 10:10 AM

New blog post: Work Method Statements – more examples http://www.safetyrisk.com.au/2010/07/12/work-method-statements-more-examples/

Leave a Comment

Previous post:

Next post: